Arlong

Arlong is card OP03-022 in Pillars of Strength, an One Piece Card Game booster set released on 30 June 2023. It's a Leader card. This set also has it as Parallel · Leader. The name Arlong is in 11 other sets of the catalog too, most recently The Time of Battle (12 June 2026).

A drawing of Arlong in the One Piece card layout
A drawing in the card's layout and colours. No photo yet.
Set code
OP03
Card number
OP03-022
Rarity
Leader
Released
30 June 2023
Series
Booster Pack
In the set
Card 27 of 154

Got this card? Add it to CardAverage with its photos, condition or grade and your own price, and see how much of Pillars of Strength you have. Free, and it works offline.

Add Arlong

Other printings in Pillars of Strength

Arlong in other sets

What is Arlong worth?

Recent sales are the best guide to what a card is worth, and condition or a grade changes it a lot. These open the latest prices for this card:

From Gloath Limited's card catalog, built from punk-records and TCGplayer catalogue (through TCGCSV). Checked 5 November 2026. Card names are facts about published products; the games are trademarks of their owners.